Caboolture Hospital Expansion Stage 1

The infrastructure at Caboolture Hospital is operating at capacity in a number of areas, and the hospital currently faces long emergency department waiting times and overcrowding.

The hospital’s current physical condition and functionality is not supporting the efficient and effective delivery of contemporary health services at the hospital. Forecast demand, driven by a growing and ageing population and high levels of chronic disease, is expected to place further pressure on the hospital.

Building Queensland led the Caboolture Hospital Expansion Stage 1 Detailed Business Case in partnership with Queensland Health. The detailed business case assessed options including a combination of a new build and refurbishment of existing facilities.

The business case was completed in Q2 2018.

All Completed Business Cases

Bruce Highway – Deception Bay Road Interchange Stage 1 (Package 3)

Building Queensland led the development of the Bruce Highway Deception Bay Road Interchange Detailed Business Case in partnership with the Department of Transport and Main Roads. The business case investigated the following enhancements to reduce congestion and improve safety: replacement of the existing two-lane Deception Bay Road bridge over the Bruce Highway with two 4 […]

More

Nullinga Dam and Mareeba Dimbulah Water Supply Scheme Improvements

Building Queensland led the development of the Nullinga Dam and Mareeba Dimbulah Water Supply Scheme Improvements Detailed Business Case in partnership with Sunwater. The business case provides a robust assessment of the opportunities and challenges of increasing water availability in support of potential future agricultural demand in the Mareeba Dimbulah Water Supply Scheme. The business […]

More

Beerburrum to Nambour Rail Upgrade Project

Building Queensland delivered the completed Business Case to government in December 2016.

More